College of Engineering Seminars & Speakers

View Full Calendar

2-Day Short Course on Tunneling by Dr. Gary S. Brierley | Day 2

Event Type
Conference/Workshop
Sponsor
CEE
Location
NCEL 3310
Date
Feb 24, 2024   7:30 - 11:45 am  
Speaker
Dr. Gary S. Brierley
Registration
Registration
Views
9
Originating Calendar
CEE Seminars and Conferences

Gary S. Brierley, President of Doctor Mole Incorporated, graduated from the University of Illinois at Urbana- Champaign with M.S. and Ph.D. degrees in civil engineering. Known as an expert in the tunneling industry, he has improved underground design practices by serving as a project manager and providing executive oversight on many well-known projects throughout the United States including DuPont Circle Subway Station, the Rochester New York CSO Project, Caldecott Tunnel Fourth Bore, the Dulles Airport Tunnel System and Boston’s Big Dig.

Dr. Brierley has also developed a reputation as an entrepreneur and has participated in two successful start-up engineering design practices: Brierley and Lyman and Brierley Associates. He has served as President of the American Underground Construction Association, Chairman of the Underground Technology Research Council, and as a member of the U.S. National Committee on Tunneling Technology.

A member of several professional societies, Dr. Brierley has authored more than 200 technical papers and articles for tunneling publications including the “Ask Dr. Mole” column for TBM magazine. At present, Dr. Brierley is serving as a sole proprietor consultant assisting engineers, contractors, attorneys and owners with the design and construction of underground projects and with the resolution of disputes involving underground construction.

Saturday Feb 24, 2024 (NCE 3310)


7:30-8:00am 

Breakfast

8:00-8:45am 

Shaft Design and Construction

8:45-9:30am 

Ground Improvement Techniques

9:30-10:00am 

Break

10:00-10:45am 

Contracting Practices for Tunnels

10:45-11:15am 

Construction Management for Tunnels

11:15-11:45am 

Career Development

*Snacks will be provided during breaks


link for robots only