CEE Seminars and Conferences
Tuesday, February 3, 2026
-
12:00 - 1:30 pmSessions will take place from Noon-1:30 pm CST each day: Feb. 3, 2026 - Part 1 Manufacturing QA/QC Feb. 4, 2026 - Part 2 Subgrade Prep & Compaction Inspection Feb. 10, 2026 - Part 3 Factory QA & QC Feb. 11, 2026 - Part 4 Field QA/QC Feb. 17, 2026 - Part 5 Post Installation Maintenance & Leak Location Feb. 18 - 28, 2026 Online Certification Exam Available
Wednesday, February 4, 2026
-
12:00 - 1:30 pmPart 2 of the 5-Part CQA Series will focus on subgrade preparation for flexible geomembranes. This course will describe the requirements for subgrade preparation before a flexible geomembrane is deployed, such as maximum rock size allowed, presence of water, degree of compaction, moisture content, compactive effort, and smooth rolling the surface before geomembrane install
Tuesday, February 10, 2026
-
12:00 - 1:30 pmPart 3 of the 5-Part CQA Series will provide in depth information on factory fabrication quality control. We will follow the process of quality assurance beginning with receiving the raw materials through the panel conversion process and finally shipment to the customer. Details of raw material inspection, fabrication machine setup and qualifications, in-process ASTM testi
Wednesday, February 11, 2026
-
12:00 - 1:30 pmPart 4 of the 5-Part CQA Series will summarize third-party geosynthetic materials and installation inspection practices that ensure quality installation and workmanship that meet and/or exceed project permitting requirements, and final acceptance in accordance with the plans and specifications. The process that will be presented ensures that clients receive a defendable as
Thursday, February 12, 2026
-
12:00 - 1:00 pm2312 Newmark Civil Engineering Laboratory
Tuesday, February 17, 2026
-
12:00 - 1:30 pmPart 5 of the 5-Part CQA Series will focus on activities that owners and operators should perform to maintain their liner system after installation. Best practices for locating the leakage source, determining an appropriate action leakage rate, and conducting electrical leak surveys also will be discussed.