CEE Seminars and Conferences
-
12:00 - 1:30 pm 2/10/2026Part 3 of the 5-Part CQA Series will provide in depth information on factory fabrication quality control. We will follow the process of quality assurance beginning with receiving the raw materials through the panel conversion process and finally shipment to the customer. Details of raw material inspection, fabrication machine setup and qualifications, in-process ASTM testi
-
12:00 - 1:30 pm 2/11/2026Part 4 of the 5-Part CQA Series will summarize third-party geosynthetic materials and installation inspection practices that ensure quality installation and workmanship that meet and/or exceed project permitting requirements, and final acceptance in accordance with the plans and specifications. The process that will be presented ensures that clients receive a defendable as
-
12:00 - 1:30 pm 2/17/2026Part 5 of the 5-Part CQA Series will focus on activities that owners and operators should perform to maintain their liner system after installation. Best practices for locating the leakage source, determining an appropriate action leakage rate, and conducting electrical leak surveys also will be discussed.